Safety Programs
Development
Management
Supervision
Assistance

Regulatory Compliance
Training
Onsite inspections
Audits
Compliance qualification
Fine/citation representation
HAZMAT transportation
Clean-up assistance

Safety Audits/Inspections
Plants, facilities, offices
Offshore and onshore
Drilling operations
Production units
Fleet/transportation
Safety mgmt. systems
Geophysical land/marine seismic operations
Marine facilities, platforms, vessels

Safety Assistance
Onsite HSE representation
Accident investigations
Root cause analysis
USDOT supervisor drug and alcohol awareness training
Air, noise, norm and confined space entry surveys


  
 

Proforma Safety, LLC

Proforma PSI…when performance counts.

LNG Pipe Test Successfully Completed

Proforma Safety International has just completed another safety assurance assignment for BP during Phase Two of the cryogenic testing of various materials to be used in the transportation of LNG (liquefied natural gas). Under a joint partnership between BP and Chart Industries in New Iberia, Louisiana, the test were conducted under controlled conditions and provided valuable information for future pipeline construction projects.

PSI provided the on-site HSE (Health, Safety and Environmental) Coordinators to assure all test and various operations connected with their set-up, were preformed in accordance to the Hazard Identification (HAZID) and Hazard Operations (HAZOPS) directives compiled by PSI early last year.

Several hazardous materials were present during the six month long test including pressure containing vessels, earth moving machinery and cranes making heavy overhead lifts. The project logged some 65,000 man hours worked without a single OSHA recordable incident, first aid case, day-away-from-work case, vehicle accident or any equipment damage. Mike Arnold, the PSI assigned Site Safety Person also served as the site Medic and the Emergency Services Coordinator for the entire project.